Project Update: 26 Jul,2010

Henry Chan carried out a footprint survey of the existing large villa recently. The footprint measured 264.2 sq.m.
We are allowed to construct a 2 storey building, so we will have a total of 528.4 sq.m.floor area.
A preliminary plan is being drawn up to be submitted to the Building Dept. to complete the Section 16 application.
This is just a rough plan to show the Govt. that we are not overextending the present building (so as to keep the same footprint basically) We are allowed to resubmit the final architectural plans when Sec 16 application is approved.

This phase will take 1.5 to 3 months, thereafter we will submit the plans for the Building Permit to commence work.

John

Inspection result at Building Department

Collected requested floor plan

Details of inspection result:
Totally 6 approved floor plan were collected in Building Department, and sent to office.

  • Drainage plan – 3 plans & documents (whole building’s drainage system)
  • Others drawings – 3 plans & documents (adjacent slope outline and overall outline building)

3 comments to Inspection result at Building Department

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>